● Office Relocation

How do I plan an office relocation in Melbourne (checklist)?

Planning an office relocation requires a structured approach focusing on budget, size, location, and amenities. The process involves four key stages: packing, moving, unpacking and setting up, and disposing of the old space.

Early planning and a detailed furniture audit are necessary to avoid delays during the transition.

What factors determine the new office selection?

Budget costs vary based on the size and location of the new office. Comparing quotes from different movers is the best way to manage these costs. The new space must be large enough for all employees and equipment but not so large that maintenance becomes too expensive. Location choice should prioritise accessibility, public transportation, and proximity to potential clients to support business growth.

How is the packing process managed?

Packing starts with a thorough sort of all belongings to decide what is no longer needed. Everything that is kept must be packed into boxes and labelled clearly. This organisation prevents confusion when unloading the truck at the new Melbourne premises.

What does the physical move entail?

Hiring professional movers reduces the time and energy spent on the heavy lifting. The process involves loading belongings into the truck and driving them to the new location. Once unloaded, the team focuses on placing furniture and setting up computer systems.

How should furniture be planned for the new space?

Measuring all current furniture is a required step to ensure everything fits the new layout. Having a detailed plan for the setup makes the unpacking process more efficient. Progressive Office’s professional installation team can help coordinate this placement to avoid errors.

How to mitigate risks during the move?

A trial run of the move can help identify potential problems before the actual day arrives. Because unexpected issues often arise, maintaining a backup plan is necessary for a successful transition. Staying relaxed helps manage the stress of an otherwise daunting task.

What is required for the old office handover?

The final step is the disposal of the old office space and furniture. This requires a full clean of the space before returning keys to the landlord. Terminating all relevant leases and contracts ensures the business is fully transitioned.

Frequently asked questions

Why is a furniture audit important?

It helps you decide what items to keep and what to discard during the packing phase. This prevents the transport of unnecessary equipment to the new site.

What are the risks of poor relocation planning?

Poor planning can make the process overwhelming and lead to hiccups on moving day. A structured list helps ensure nothing is forgotten.

How should boxes be handled during the move?

Every box should be labelled clearly. This saves time and reduces frustration during the unpacking and setup phase.

Questions to ask your supplier before you buy

  • Can you provide a CAD floorplan to confirm existing furniture fits the new sqm?
  • What is the lead time for new commercial furniture if the audit reveals gaps in the current inventory?
  • Do you provide professional installation services to coordinate the furniture setup on moving day?
Progressive Office has been fitting out Melbourne workplaces since 1989. Here\'s why Australian businesses have chosen Progressive since day one. Visit our showroom in Knoxfield, or speak to a consultant to arrange a free space plan for your office. Download our latest catalogue here.